Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
Repository logo
  • Communities & Collections
  • Research Outputs
  • Fundings & Projects
  • People
  • Statistics
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Indian Institute of Technology Madras
  3. Publication11
  4. Heuristics for scheduling in flowshop with multiple objectives
 
  • Details
Options

Heuristics for scheduling in flowshop with multiple objectives

Date Issued
04-05-1995
Author(s)
C Rajendran 
Indian Institute of Technology, Madras
DOI
10.1016/0377-2217(93)E0212-G
Abstract
Most of the heuristics for flowshop scheduling aim at minimizing makespan. However, scheduling with multiple objectives, such as that of minimizing makespan, total flowtime and machine idletime, is more effective in reducing the total scheduling cost. In this article, we first address the problem of scheduling to minimize makespan and total flowtime, and propose a new heuristic algorithm. A heuristic preference relation is developed as the basis for the heuristic so that only the potential job interchanges are checked for possible improvement with respect to these two objectives. The proposed as well as the existing heuristics are evaluated in a large number of randomly generated large-sized problems. The proposed heuristic algorithm is then extended to cover the problem of scheduling to minimize makespan, total flowtime and machine idletime. The results of the experimental investigation of the evaluation of this heuristic algorithm and the existing heuristic in meeting these objectives are also reported. It is found that both the proposed heuristics are more effective than the existing one for scheduling with multiple objectives. © 1995.
Volume
82
Subjects
  • Flowshop scheduling

  • Flowtime

  • Heuristics

  • Machine idletime

  • Makespan

  • Multiple objectives

Indian Institute of Technology Madras Knowledge Repository developed and maintained by the Library

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback