Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
Repository logo
  • Communities & Collections
  • Research Outputs
  • Fundings & Projects
  • People
  • Statistics
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Indian Institute of Technology Madras
  3. Publication8
  4. Configuration estimation method for preliminary cost of ships based on engineering bills of materials
 
  • Details
Options

Configuration estimation method for preliminary cost of ships based on engineering bills of materials

Date Issued
01-12-2011
Author(s)
Son, Myeong Jo
Lee, Sang Chul
Kwon, Ki Chang
Kim, Tae Wan
Rajiv Sharma 
Indian Institute of Technology, Madras
DOI
10.1007/s00773-011-0139-9
Abstract
Ships are complex engineering structures that are designed and built on the basis of technical experience. A shipowner will often be required to estimate the price of a new ship on the basis of the value of comparable ships identified in trade journals. Similarly, shipbuilders are often interested in estimating approximate costs during the tendering phase in order to determine whether a ship is likely to be competitive for a particular order. Thus, when designing a ship prior to having obtained a contract, one of the most important processes is the estimation of approximate costs, including materials, associated labor, and overhead. During this preliminary design phase, the design is temporary and subject to change based on variations in the shipowner's requirements. Hence, quick and flexible responses are key during this period and an integral aspect of the competitive powers of the shipbuilder. Given this environment, we propose a 'configuration estimation method.' Our method is based on the configuration design method that is widely used in three-dimensional (3D) computer aided design (CAD) systems. We assume that a product lifecycle management system is furnished and that the cost is then estimated via the configuration of the ship, using an engineering bill of materials (E-BOM). In referring to the E-BOM, we utilize technical parametric costs derived from similar ships built previously. Using the proposed method, it is possible to obtain an accurate list of materials from the quotation, as well as a detailed work assessment for labor costs and overhead rates, so that reliable cost estimates can be generated quickly and flexibly. To demonstrate the practical applicability and effectiveness of the proposed method, we implement the prototype of a shipbuilding configuration estimation system by using a Microsoft Structured Query Language database and an E-BOM from AVEVA Marine version 12.01, which is a representative CAD system for shipbuilding. © JASNAOE 2011.
Volume
16
Subjects
  • Configuration design ...

  • Configuration estimat...

  • Engineering bill of m...

  • Preliminary ship desi...

  • Product lifecycle man...

  • Ship-building CAD

Indian Institute of Technology Madras Knowledge Repository developed and maintained by the Library

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback