Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
Repository logo
  • Communities & Collections
  • Research Outputs
  • Fundings & Projects
  • People
  • Statistics
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Indian Institute of Technology Madras
  3. Publication2
  4. Structural to interfacial fracture transition in epoxy coated hydrating cement
 
  • Details
Options

Structural to interfacial fracture transition in epoxy coated hydrating cement

Date Issued
06-12-2021
Author(s)
Gujar, Pratik
Hirshikesh, Hirshikesh
Ratna Kumar Annabattula 
Indian Institute of Technology, Madras
Pijush Ghosh 
Indian Institute of Technology, Madras
DOI
10.1016/j.conbuildmat.2021.125128
Abstract
In this work, the fracture behavior of an epoxy coated hydrating cement paste system is investigated with the aid of a slant shear test. A finite element model based on the phase-field method (PFM) is used to simulate the crack propagation and understand the transitions from structural to interfacial fracture and vice versa. At construction sites, it is a usual practice to coat epoxy only after the concrete is completely cured, i.e. after 28 days. However, during hydration, the surface energy of the cement paste varies with time. Therefore, it is necessary to investigate the temporal dependency of the interfacial strength on the instant (time) of coating. With this in mind, we investigated fracture processes in the cement paste, coated with epoxy at various time instants, from an early age (2 days) to the later age (28 and 50 days) of cement paste. From the experimental and numerical results, the cohesive failure of cement paste (bulk or structural failure) is primarily observed for 2-days hydrated cement paste. In contrast, adhesive failure at the interface between cement paste and epoxy (interface fracture) is observed for 28 and 50-days hydrated cement paste. In our fracture analysis, we have incorporated the surface roughness and the bulk porosity of cement paste which evolves over time during the hydration process. From the results of numerical analysis, it is found that the fracture behavior of the cement-epoxy system can be controlled by tuning the material properties of the cement paste and the interface i.e., elastic modulus, E and fracture energy Gc. Also, it is observed that the surface roughness and the bulk porosity of cement paste significantly influence the crack trajectory as well as the load–displacement response of the cement-epoxy system.
Volume
310
Subjects
  • Epoxy coated cement p...

  • Interface failure

  • Phase field method

  • Slant shear test

  • Structural failure

Indian Institute of Technology Madras Knowledge Repository developed and maintained by the Library

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback