Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
Repository logo
  • Communities & Collections
  • Research Outputs
  • Fundings & Projects
  • People
  • Statistics
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    or
    New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Indian Institute of Technology Madras
  3. Publication9
  4. Completion time variance minimization in single machine and multi-machine systems
 
  • Details
Options

Completion time variance minimization in single machine and multi-machine systems

Date Issued
01-01-2010
Author(s)
Srirangacharyulu, B.
G Srinivasan 
Indian Institute of Technology, Madras
DOI
10.1016/j.cor.2009.03.007
Abstract
In this paper we consider the problem of minimizing the completion time variance of n jobs on a single machine with deterministic processing times. We propose a new heuristic and compare the results with existing popular heuristics for the problem. We also propose a method based on genetic algorithms to solve the problem. We present the worst case performance analysis of the proposed heuristic. We also consider the problem of minimizing the completion time variance of n jobs on m identical parallel machines in both restricted and unrestricted versions. A heuristic method and a method based on genetic algorithms are presented for both the cases and results of computational testing are provided. It is concluded that the proposed methods provide better results compared to existing methods for the single machine case as well as for the multi-machine case. © 2009 Elsevier Ltd. All rights reserved.
Volume
37
Subjects
  • Completion time varia...

  • Genetic algorithms

  • Heuristic

  • Multi-machine schedul...

  • Single machine schedu...

Indian Institute of Technology Madras Knowledge Repository developed and maintained by the Library

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback